Physical Infrastructure Manufacturing
The Physical Infrastructure Manufacturing capture lane traces 1 verified events documenting this mechanism of institutional capture.
| Date | Event | Lanes | Status |
|---|---|---|---|
| 2025-07-29 | ModCorr Leases 252,282 sqft from PNK at Allenwood, PA to Manufacture Modular Prison Cells — Same Campus Where PNK Later Proposes AI Data Center ModCorr LLC · PNK Group · PNK P2 LLC · Andrey Sharkov · +2 | confirmed |