Skip to content
The Cascade Ledger
Capture Cascade Timeline · 1142–2026
Timelines
Explorer
By Year
By Decade
Lanes
Actors
Tags
Filter
About
Ledger
›
Tags
›
Grid-Infrastructure
Tag index
#Grid-Infrastructure
Events indexed under
#Grid-Infrastructure
— 6 entries in the record.
6
events
From
Aug 3, 2026
To
Aug 19, 2026
Open in filter view →
Activity over time
Events per year
2026 · 6 events
2026
2026
Date
Event
Lanes
Status
2026-08-19
Oracle Drops Wisconsin PSC Suit, Leaving $100M-Plus Annual Collateral Requirement for Port Washington Campus
4 src
Oracle · Wisconsin Public Service Commission · We Energies · OpenAI
confirmed
2026-08-13
Attorney Challenges Oracle/OpenAI $43B Saline Township Tax Break, Arguing Township Skipped Required Public Hearing
3 src
Oracle · OpenAI
confirmed
2026-08-12
Louisiana PSC Votes 3-1 to Let Meta Hide Electricity Demand Data for $50B Hyperion Campus
3 src
Meta Platforms · Sierra Club
confirmed
2026-08-11
Wisconsin PSC Forces ATC to Restart $1.7B Port Washington Data Center Grid Application; FERC Gap Leaves Ratepayer Cost-Shift Unresolved
2 src
Wisconsin Public Service Commission · We Energies
confirmed
2026-08-05
~1,000 Effingham County GA Residents Confront OpenAI Over $20B, 3.2GW Project Camellia Data Center
3 src
OpenAI
confirmed
2026-08-03
Gov. Abbott Freezes Texas Data Center Grid Connections, Orders ERCOT/PUCT Audit
3 src
Greg Abbott · ERCOT · Public Utility Commission of Texas · Meta Platforms · +4
confirmed